Reflective Large Dog Leash Nylon Rope Pet Running Tracking Leashes Long Lead Dog Mountain Climbing Rope For Medium Large Big Dog
Sale

Reflective Large Dog Leash Nylon Rope Pet Running Tracking Leashes Long Lead Dog Mountain Climbing Rope For Medium Large Big Dog

(20 customer reviews) 0 sold

$23.99 $13.99

Clear
Quantity
Compare
SKU: 32907053131 Category:

Reflective Large Dog Leash Nylon Rope Pet Running Tracking Leashes Long Lead Dog Mountain Climbing Rope

Suit For: Medium Large Big Dog

Size: 150cm

Feature: Durable/Heavy Duty

  • SAFETY FOR YOUR DOG
  • STRONGER THAN THE REST: Our leash is made of the STRONGEST ROPE
  • GREAT FOR TRAINING, WALKING OR RUNNING

Brand Name

Beirui

Type

Leashes, Dogs

Dog Leash Type

Basic Leashes

Pattern

Solid

Material

Nylon

Season

All Seasons

Feature

Reflective, Other

Customer reviews
5.00
20 ratings
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
20 reviews for Reflective Large Dog Leash Nylon Rope Pet Running Tracking Leashes Long Lead Dog Mountain Climbing Rope For Medium Large Big Dog
  • 5 out of 5

    Arrived in 20 days. D solid appearance, the plastics really feel very strong however.

  • 5 out of 5

    This is the best delivery and the best item ordered for the dog!) before the nsk came very quickly, about 10-12 days, already walked!) durable reliable leash, convenient to hold in your hand!!)))

  • 5 out of 5

    Everything is okay. It arrived very quickly, 15 days from 11/11, thank you. Chile.

  • 5 out of 5

    Leash just class!!! Very durable beautiful i’m very happy

  • 5 out of 5

    Strong but the carbine is weak on a large dog bends the dog fell off the place and i was thrown a leash withstood the carbine slightly retreated

  • 5 out of 5

    Very good product, looks the same as in the pictures. Arrival of product within the delivery time. Very satisfied with the purchase. Seller recommended.

  • 5 out of 5

    Arrived on time.
    Material very good, very good quality in what is expected.
    Recommend supplier.
    Very good thank you.

  • 5 out of 5

    Very good lanyard, my dog (zdj, 30 kg) tight can the Yank on dworze, wiec often have to exchange lanyards, because not withstand its temperament. ABOUT dziwo these lanyard we have already long and nothing to with her not happening. Recommend!!

  • 5 out of 5

    The leash is great. Solid. Fast delivery. I recommend!

  • 5 out of 5

    The leash looks very good and the handle is so soft and comfortable to hold! The carabiner is sturdy, it’s thicker than normal carabiners. My dog weighs almost 20kg and with the leash I have him perfectly under control, recommend!

  • 5 out of 5

    I loved it. it’s good stuff, especially for dogs that pull. I arrive super fast in 2 weeks.

  • 5 out of 5

    Very fast shipping

  • 5 out of 5

    Everything corresponds to the description. Good quality product.

  • 5 out of 5

    Received in three weeks. I am very happy with this product.

  • 5 out of 5

    best quality

  • 5 out of 5

    Good quality, thick and tough cord, nice

  • 5 out of 5

    Have good quality athletic size เหมาะมือ price suitable

  • 5 out of 5

    Good product

  • 5 out of 5

    Very well made. Great!

  • 5 out of 5

    Really cool product

Write a customer review

Add a review

0

TOP

X